Bathroom Works

Waterproofing first, finish second — the order that keeps a bathroom dry.

25+

Years of Experience

18+

Projects Completed

100%

Site-Supervised Execution

The Work

A bathroom is the one room where a shortcut cannot stay hidden. Water finds every gap eventually, and by the time it shows on the ceiling below, the tiling has to come off to reach the cause. We treat the waterproofing layer as the real deliverable and the tiling as what protects it.

That means the sequence is not negotiable: sunken slab prepared, waterproofing laid and ponded, plumbing run and checked, and only then the screed and the finish. Each stage is signed off before the next one covers it, so the builder is never asked to take the layer underneath on faith.

What the scope covers

  • Sunken slab preparation and filling
  • Waterproofing treatment to floor, and up the wall at wet junctions
  • Concealed hot and cold water lines
  • Drainage, trap and outlet positioning with correct fall
  • Floor and wall tiling, including niches and skirting details
  • Fixture and sanitaryware installation
How We Keep It Precise

The details that decide the finish

Anyone can lay the material. What separates a finish that holds up from one that does not is the work that happens before it goes on.

01

Ponding test before anything covers it

Waterproofing is flooded and held before the screed goes down. If it does not hold, it is corrected at the stage where correcting it is cheap.

02

Fall set to the trap, across the whole floor

The floor is graded so every point drains to the outlet. No flat corners, no puddle that sits until it evaporates.

03

Turned up at the junctions

Waterproofing is carried up the wall at the shower and wet zones, because the floor-to-wall junction is where failures start, not the middle of the floor.

04

Tile layout planned from the centre

Setting out starts from the visual centre of the wall so cut tiles land in the corners, and full tiles face you when you walk in.

Materials & finishes we work in

Anti-skid floor tilesVitrified and ceramic wall tilingNatural stoneConcealed cistern and shower systemsRecessed niches and shelves

Checked at handover

  • Waterproofing tested and recorded before covering
  • Full drainage flow checked at every outlet
  • Fixtures installed, aligned and running
  • Joints and silicone lines finished clean

Planning bathroom works on your project?

Tell us where the structure has reached and what the scope looks like. We will visit the site and come back with a plan for the finishing work.